Part 150 Noise Study
bar
 
spaceHomeNewsPublic MeetingsFrequently Asked QuestionsNoise Study Documents  
To ensure your jurisdiction, agency or organization is as informed as possible, documents developed during the course of the Part 150 Study will be posted here. The documents are listed here by topic.

line

OSU Airport Part 150 Noise and Land Use Compatibility Study Draft Report (Submitted to FAA, June 2010)

Report Cover
Table of Contents
Chapter 1: Introduction
Chapter 2: Aviation Activity Forecast
Chapter 3: Noise Fundamentals
Chapter 4: Noise Modeling
Chapter 5: Airport Operational Data
Chapter 6: Noise Exposure
Chapter 7: Coordination
Chapter 8: Noise Certification
Chapter 9: Aircraft and Airport Operations Noise Abatement and Mitigation Alternatives
Chapter 10: Off Airport Land Use Compatibility Planning
Chapter 11: Noise Program Management
Chapter 12: Implementation of Noise Compatibility Program
Chapter 13: Program Benefits Costs Reviews and Updates
Appendix A: Review of OSUA’s Noise Complaint Study
Appendix B: Noise Measurement Observations
Appendix C: Aircraft Modeling Substitution Approval
Appendix D: Existing Flight Tracks
Appendix E: Future Flight Tracks
Appendix F: Evaluation of Jet Altitude Profiles
Appendix G: Operations Verification
Appendix H: Part 150 Advisory Committee and Technical Subcommittee Rosters
Appendix I: Newsletters
Appendix J: Media Outreach and News Coverage
Appendix K: Meeting Announcements
Appendix L: Open House Sign-In Sheets
Appendix M: Meeting Summaries
Appendix N: Part 150 Study Website
Appendix O: Aviation Acronyms
Appendix P: Aviation Glossary
Appendix Q: 2008 NEM (11" x 17")
Appendix R: 2013 NEM (11" x 17")
Appendix S: Public Comments
Appendix T: Technical Subcommittee Materials
Appendix U: Sound Exposure Level Contours
Appendix V: Flight Track Use Percentages
Appendix W: Noise Abatement Guidelines
Appendix X: NEM Checklist
Appendix Y: FAA Correspondence
Appendix Z: Public Hearing Transcript


line


OSU Airport Part 150 Noise and Land Use Compatibility Study Draft Report (October 2009)

The document below includes chapters summarizing Phase 1 of the study – the Noise Exposure Map development phase – and Phase 2 of the study – the Noise Compatibility Program development phase. Chapters one through eight have already been submitted and accepted by the Federal Aviation Administration. Chapters nine through 13 are new, and summarize the Noise Compatibility process, review, analysis, findings and recommendations. We will continue to accept comments on these draft chapters through Friday, December 11, 2009.

For your convenience, the entire draft report is provided below, followed by the sections that were produced for each study phase..

Printed copies of the draft report are available at OSU Airport and the Dublin, Old Worthington and Hard Road libraries.

Cover
Table of Contents
Chapter 1: Introduction
Chapter 2: Forecast
Chapter 3: Noise Fundamentals
Chapter 4: Noise Modeling
Chapter 5: Operational Data
Chapter 6: Noise Exposure
Chapter 7: Coordination
Chapter 8: Noise Certification
Chapter 9: Aircraft and Airport Operational Alternatives
Chapter 10: Off Airport Land Use Compatibility Planning
Chapter 11: Noise Program Management
Chapter 12: Implementing Noise Compatibility Program
Chapter 13: Program Benefits Costs Reviews and Updates
Appendix A: Review of OSUA’s Noise Complaint Study
Appendix B: Noise Measurement Observations
Appendix C: Aircraft Modeling Substitution Approval
Appendix D: Existing Flight Tracks
Appendix E: Future Flight Tracks
Appendix F: Evaluation of Jet Altitude Profiles
Appendix G: Operations Verification
Appendix H: Part 150 Advisory Committee and Technical Subcommittee Rosters
Appendix I: Newsletters
Appendix J: Media Outreach and News Coverage
Appendix K: Meeting Announcements
Appendix L: Open House Sign-In Sheets
Appendix M: Meeting Summaries
Appendix N: Part 150 Study Website
Appendix O: Aviation Acronyms
Appendix P: Aviation Glossary
Appendix Q: 2008 NEM (11" x 17")
Appendix R: 2013 NEM (11" x 17")
Appendix S: Public Comments Through August 2009
Appendix T: Technical Subcommittee Materials
Appendix U: Sound Exposure Level Contours
Appendix V: Flight Track Use Percentages
Appendix W: Noise Abatement Guidelines
Appendix X: NEM Checklist
Appendix Y: FAA Correspondence
Letter to FAA With Omitted Phase 1 Stakeholder Comments

line

Part 150 Phase 2
line

Chapter 9: Aircraft and Airport Operations Noise Abatement and Mitigation Alternatives
Chapter 10: Off Airport Land Use Compatibility Planning
Chapter 11: Noise Program Management
Chapter 12: Implementation of Noise Compatibility Program
Chapter 13: Program Benefits Costs Reviews and Updates
Appendix S: Public Comments
Appendix W: Noise Abatement Guidelines
Appendix X: NEM Checklist
Appendix Y: FAA Correspondence

Noise Abatement Technical Analysis Memo – April 2009
Noise Compatibility Memo – January 2009

line

Part 150 Phase 1
line

OSU Airport Final Noise Exposure Map Report
Table of Contents
Chapter 1: Introduction
Chapter 2: Forecast
Chapter 3: Noise Fundamentals
Chapter 4: Noise Modeling
Chapter 5: Operational Data
Chapter 6: Noise Exposure
Chapter 7: Coordination
Chapter 8: Noise Certification
Appendix A: Review of OSUA’s Noise Complaint Study
Appendix B: Noise Measurement Observations
Appendix C: Aircraft Modeling Substitution Approval
Appendix D: Existing Flight Tracks
Appendix E: Future Flight Tracks
Appendix F: Evaluation of Jet Altitude Profiles
Appendix G: Operations Verification
Appendix H: Part 150 Advisory Committee and Technical Subcommittee Rosters
Appendix I: Newsletters
Appendix J: Media Outreach and News Coverage
Appendix K: Meeting Announcements
Appendix L: Open House Sign-In Sheets
Appendix M: Meeting Summaries
Appendix N: Part 150 Study Website
Appendix O: Aviation Acronyms
Appendix P: Aviation Glossary
Appendix Q: 2008 NEM (11" x 17")
Appendix R: 2013 NEM (11" x 17")
Appendix S: Public Comments
Appendix T: Technical Subcommittee Materials
Appendix U: Sound Exposure Level Contours
Appendix V: Flight Track Use Percentages
Letter to FAA With Omitted Phase 1 Stakeholder Comments
FAA NEM Acceptance Letter
Map A: 2008 Noise Exposure Map
Map B: 2013 Noise Exposure Map
ESA Memo on OSU Airport Noise Complaint System Review

line

Phase I Reference Guide
Study Background and Process
Decision-Making Framework
Noise Model Inputs Part 1
Technical Memo on Noise Modeling
Noise Model Inputs Part 2
Noise Modeling Overview and Draft Noise Exposure Maps
Part 150 Overview and Draft Exposure Maps
Noise Monitoring Locations
Measurement Results – East
Measurement Results – West

line

Part 150 Committee
line

Roster
Operating Agreement
Goals

line

Part 150 Study Team
line

Core Working Team
RS&H Consultant Team Resumes

line

Part 150 Newsletters
line

Newsletter #1
Newsletter #2
Newsletter #3

line

 
bottom